Barrack 100 is the first to be built from the ground up at the installation since 2012 and will house 250 69th ADA Bde. Soldiers in two-Soldier suites — as a one plus one configuration. The project was funded by Congress in 2020 under the National Defense Authorization Act. This new barracks will improve quality of life for the soldiers and minimize their commute to work. The one plus-one configuration of the rooms will allow for more privacy and space to designate as their own. In addition to having their own rooms, each with a walk-in closet, they will share a larger, open kitchenette area as well as a bathroom.
Project Details
Size: Multiple BuildingsTotal Project Cost: $49.6 Million